Approved-online-essay-writers

Construction Strategy for the Proposed MMC Report – Management Assignment Help

Task 

CASE STUDY
Cardiff Wales is providing a net increase of 629 bedrooms for student accommodation at the Marble Campus as part of a two-phase £200 million development scheme. The existing buildings on the site (Marble student residences – Site1) have been demolished to allow for the creation of 881 new bed spaces (Phase 1). Alongside, a new health centre and accommodation staff offices within the east side. The planning application was submitted at the end of August 2020 and the project started in November 2021. Vinci Construction has secured the £77m contract. The UK arm of the French firm has committed to build a low-energy-consumption student accommodation building at Marble campus in Cardiff. The three-block project is referred to as Student Accommodation Project 3 by the contractors. 

A-Plus Writing Help For University Students

Get expert assistance in any academic field. All courses and programs covered.

Get Help Now!

The new 26,000-square-metre accommodation buildings aspiring to be Passivhaus-certified will be laid out in four, six and eight-bed clusters. The Passivhaus certification means the building will have a low energy requirement/consumption for both heating and cooling. It’s been said that: “When completed, the development will represent one of the largest low-carbon-certified developments of its kind and a first for the university sector in the UK.”  The main part of the construction process will run in the 2022-24 period. Construction work on phase 1 of the new buildings started in summer 2021 and is to be completed and ready for occupation in September 2023.


The Context & Task
You have been selected to write a report on the proposal on MMC for the Cardiff New Accommodation, Wales. As the way forward, the Client has proceeded to appoint you to further develop the detailed report on the construction strategy for the proposed MMC aligned to stage 7 of the RIBA Plan of Work. 

In this context you will write a report with the approach of using RIBA Plan of Work Stage 7: Durability and Maintanance (Long-term use, durability, maintenance, and operational sustainability of the proposed MMC). The MMC Category 5 – Pre-manufacturing (non structural assemblies and sub-assemblies) is being selected for the construction and the materials for the constructions based on the MMC Category 5 are: 

  • Bathroom Pods
  • concrete – slab and ceiling
  • Galvanized steel – window frames, door frames, columns
  • Ceramic tiles – attached to dry wall
  • Lighting – LED Ceiling light
  • wall – insulation wall
  • water treatment – reed bed sewage treatment

Welcome to our Online Essay Writing Agency. Securing higher grades costing your pocket? Order your assignment online at the lowest price now! Our online essay writers are able to provide high-quality assignment help within your deadline. With our homework writing company, you can order essays, term papers, research papers, capstone projects, movie review, presentation, annotated bibliography, reaction paper, research proposal, discussion, or another assignment without having to worry about its originality – we offer 100% original content written completely from scratch

We write papers within your selected deadline. Just share the instructions

PLACE YOUR ORDER